
- Ground floor - feed pipework to salt saturators
- Level 4 - Heat rejection pipework to cooler
- Level 6 - CHW and LTHW pipework
- Level 6 - Cold water pipework to pressurisation unit and bib taps
- Level 6 - Heat recovery pipework
550m of FBTBOJ self regulating heating cable was supplied and installed on all cold and chilled water pipework, along with 970m of H2OWAT55 for all other services.






