Showing posts with label Self Regulating. Show all posts
Showing posts with label Self Regulating. Show all posts

Thursday, 11 December 2014

University College London, Howland Street

For this new research centre at UCL, to be known as the Sainsbury Wellcome Centre, ESH supplied and installed trace heating to provide frost protection to the following external pipework:

  • Ground floor - feed pipework to salt saturators
  • Level 4 - Heat rejection pipework to cooler
  • Level 6 - CHW and LTHW pipework 
  • Level 6 - Cold water pipework to pressurisation unit and bib taps
  • Level 6 - Heat recovery pipework

550m of FBTBOJ self regulating heating cable was supplied and installed on all cold and chilled water pipework, along with 970m of H2OWAT55 for all other services.

Monday, 1 December 2014

Toyota Motor Manufacturing, Derby

ESH supplied, installed and tested a trace heating system to perform the duty of temperature maintaining internal metal pipework at +30°C. This was achieved utilising type FBTBOJ20/2 self regulating heating tape. 

Friday, 28 November 2014

Frankley WTW

Seven Trent Water's Frankley Water Treatment Works at Frankley, Birmingham, supplies drinking water to Birmingham and the surrounding areas. Part of the £31.5m project to upgrade Frankley WTW, ESH supplied and installed a total of 1270m of trace heating cable to perform the following duties:

  • Provide frost protection to the water / lime pipework
  • Temperature maintain the sodium bisulphite pipework at +15°C in a minimum ambient temperature of -20°C

Our FBTBOJ10/2 heating tapes were installed to the underside of the pipework in a straight trace configuration and secured to the plastic pipe using type FTA fixing tape.

Wednesday, 26 November 2014

Stockport WWTW


Stockport Wastewater Treatment Works is the 12th largest wastewater facility in the north west of England. During recent upgrades, ESH were contracted to design, supply materials and labour to install a frost protection trace heating system to external pipework and vessel in a minimum ambient temperature of -20°C. In total 840m of type FBTBOJ self regulating heating cable was required to complete this project.

Monday, 24 November 2014

Charlton Court House, Somerset

ESH supplied and installed over 200 metres of trace heating cable to the buildings DHWS plastic pipework. The system requirement was to maintain the hot water temperature at +55°C in a minimum ambient of +18°C within this large country house. 

Thursday, 23 October 2014

Skanska, Doncaster

Supplied and installed a trace heating system to frost protect the cold water service pipework. Our Type ESTSBOJ10/2 self regulating heating tape was installed to the underside of the pipework in a straight trace configuration.

Thursday, 9 October 2014

Adel Beck Secure Children's Home, Leeds

ESH were back at Adel Beck to extend the existing 1200m of trace heating installed earlier this year. An additional run of type H2OWAT55 was supplied and installed onto the DHWS pipework, maintaining a temperature of +55°C.

Friday, 19 September 2014

Lees Brook Community School, Derby

This brand new £24m school is set to replace the ageing 1950s original buildings on Morley Road. ESH were contracted to design, supply and install a trace heating system to provide frost protection to the second floor external LTHW pipework, utilising type FBTBOJ self regulating heating tape.

Thursday, 11 September 2014

Francis Crick Institute, London

The Francis Crick Institute is an interdisciplinary medical research institute due to open in 2015. ESH designed, supplied and installed type H2OWAT55 self regulating heating tape to maintain the domestic hot water pipework at temperatures of up to +55°C.

Tuesday, 2 September 2014

M&S Retail Unit, Prescot

For this band new M&S store, ESH designed, supplied and installed a trace heating system to maintain a temperature of +55°C on internal DHWS copper pipework. Type H2OWAT55 self regulating heating tape was installed across 3 floors, to areas including the plantroom, staff toilets, public toilets and kitchen area.

Wednesday, 27 August 2014

Sudbury Health Centre

Here at this brand new, state of the art health centre in Suffolk, ESH supplied and installed a frost protection trace heating system to the external LTHW pipework located on the centres roof. The system was designed using type FBTBOJ self regulating heating tape.

Monday, 18 August 2014

Wildern School, Southampton

Supplied and installed a trace heating system to temperature maintain the DHWS flow pipework at +60°C. The system utilised our H2OWATT65 self regulating heating cable and offered the option to disinfect periodically against Legionella.

Monday, 11 August 2014

Radcliffe Observatory Quarter, Oxford


Oxford University's £70m Mathematical Institute is just one part of this £200m redevelopment of the 10-acre site.

ESH were contracted to design, supply and install a frost protection trace heating system to the external CWM pipework. Type FBT self limiting heating cable was used throughout this project.




Thursday, 7 August 2014

Salford WWTW



ESH supplied and installed a trace heating system using type FBT self regulating heating tape to provide frost protection to various external pipework.

Wednesday, 6 August 2014

Operating Theatres, Northern General Hospital

Our second project here at this Sheffield based hospital saw ESH design, supply and install two separate trace heating systems:
  • The first system was designed using our type FTB self limiting heating tape to provide frost protection to external chilled pipework
  • The second frost protection system on the HTG pipework was Raychem specified, 70m of Raychem FS-A-2X heating tape was supplied and installed

Friday, 1 August 2014

Halstead Bio-Waste

Designed, supplied and installed a frost protection trace heating system to two runs of metal pipework containing cold water. One run of pipework was leading to the turbo dissolvers, the other to the heat exchangers. Type FBTBOJ self regulating heating cable was installed throughout.

Monday, 7 July 2014

Social Justice Centre, London

For this project ESH supplied and installed a trace heating system to provide frost protection to the external CHW, LTHW, HRR & LSV pipework. The system was designed using our type FTB self regulating heating tape which was straight trace underneath the external pipework.

Wednesday, 2 July 2014

Oxford Centre for Islamic Studies

Designed, supplied and install a trace heating system to perform the duty of temperature maintaining the hot water flow pipework at +55°C. To achieve this we installed our H2OWAT self regulating heating cable.

Monday, 23 June 2014

Kings Cross Station, London

ESH are very proud to have been involved in the £400m restoration and redevelopment of Kings Cross Station. We were contracted to design, supply and install a number of different trace heating systems throughout this iconic building:
  • Temperature maintenance of the HSWF pipework on the lower ground floor & basement cycle shower area,1050m of H2OWAT heating tape.
  • Frost protection to the external roof BCWS pipework, 660m of FBT self regulating heating tape.
  • Temperature maintenance of the BHWS pipework in Camden Library, 28m of H2OWAT heating tape.
  • Freeze protection to the sprinkler pipework within the basement, 200m of VC constant wattage heating tape.
  • Temperature maintenance of the domestic hot water supplies, tea point pipework on each floor, 200m of H2OWAT heating tape.

Monday, 16 June 2014

Adel Beck Secure Children's Home

For this large children's home project, ESH were contracted to design, supply and install a trace heating system to temperature maintain 1200 metres of HWS pipework. The system included 12 power junction boxes with BMS fault relays fitted. This large new children's home in Leeds creates 24 bedrooms, a teaching block, a canteen, leisure facilities and administrative space.