Friday, 28 November 2014

Frankley WTW

Seven Trent Water's Frankley Water Treatment Works at Frankley, Birmingham, supplies drinking water to Birmingham and the surrounding areas. Part of the £31.5m project to upgrade Frankley WTW, ESH supplied and installed a total of 1270m of trace heating cable to perform the following duties:

  • Provide frost protection to the water / lime pipework
  • Temperature maintain the sodium bisulphite pipework at +15°C in a minimum ambient temperature of -20°C

Our FBTBOJ10/2 heating tapes were installed to the underside of the pipework in a straight trace configuration and secured to the plastic pipe using type FTA fixing tape.

No comments:

Post a Comment