Stockport WWTW
Stockport Wastewater Treatment Works is the 12th largest wastewater facility in the north west of England. During recent upgrades, ESH were contracted to design, supply materials and labour to install a frost protection trace heating system to external pipework and vessel in a minimum ambient temperature of -20°C. In total 840m of type FBTBOJ self regulating heating cable was required to complete this project.
No comments:
Post a Comment