Stockport Wastewater Treatment Works is the 12th largest wastewater facility in the north west of England. During recent upgrades, ESH were contracted to design, supply materials and labour to install a frost protection trace heating system to external pipework and vessel in a minimum ambient temperature of -20°C. In total 840m of type FBTBOJ self regulating heating cable was required to complete this project.