
- Ground floor - feed pipework to salt saturators
- Level 4 - Heat rejection pipework to cooler
- Level 6 - CHW and LTHW pipework
- Level 6 - Cold water pipework to pressurisation unit and bib taps
- Level 6 - Heat recovery pipework
550m of FBTBOJ self regulating heating cable was supplied and installed on all cold and chilled water pipework, along with 970m of H2OWAT55 for all other services.
No comments:
Post a Comment