Showing posts with label Birmingham. Show all posts
Showing posts with label Birmingham. Show all posts
Friday, 5 December 2014
LA Fitness Gym, Birmingham
Within this popular gym, ESH supplied and installed a simple frost protection trace heating system to external heating pipework associated with an air handling unit.
Friday, 28 November 2014
Frankley WTW
Seven Trent Water's Frankley Water Treatment Works at Frankley, Birmingham, supplies drinking water to Birmingham and the surrounding areas. Part of the £31.5m project to upgrade Frankley WTW, ESH supplied and installed a total of 1270m of trace heating cable to perform the following duties:
- Provide frost protection to the water / lime pipework
- Temperature maintain the sodium bisulphite pipework at +15°C in a minimum ambient temperature of -20°C
Our FBTBOJ10/2 heating tapes were installed to the underside of the pipework in a straight trace configuration and secured to the plastic pipe using type FTA fixing tape.
Thursday, 4 September 2014
Veolia Environmental Ltd, Birmingham
Supplied and installed trace heating materials to repair an existing frost protection system.
Monday, 14 July 2014
FSD Mech Ltd, Halesowen
Within FSD's 7000 square foot manufacturing plant, ESH were contracted to supply and install a frost protection trace heating system to skid mounted pipework.
Subscribe to:
Posts (Atom)