Showing posts with label Derby. Show all posts
Showing posts with label Derby. Show all posts

Monday, 1 December 2014

Toyota Motor Manufacturing, Derby

ESH supplied, installed and tested a trace heating system to perform the duty of temperature maintaining internal metal pipework at +30°C. This was achieved utilising type FBTBOJ20/2 self regulating heating tape. 

Monday, 17 November 2014

Lees Brook Community School, Derby


For this latest project at Lees Brook School, ESH supplied and installed a frost protection trace heating system to pipework on top of the sports hall roof.

Friday, 19 September 2014

Lees Brook Community School, Derby

This brand new £24m school is set to replace the ageing 1950s original buildings on Morley Road. ESH were contracted to design, supply and install a trace heating system to provide frost protection to the second floor external LTHW pipework, utilising type FBTBOJ self regulating heating tape.