Kings Cross Station, London
ESH are very proud to have been involved in the £400m restoration and redevelopment of Kings Cross Station. We were contracted to design, supply and install a number of different trace heating systems throughout this iconic building:
- Temperature maintenance of the HSWF pipework on the lower ground floor & basement cycle shower area,1050m of H2OWAT heating tape.
- Frost protection to the external roof BCWS pipework, 660m of FBT self regulating heating tape.
- Temperature maintenance of the BHWS pipework in Camden Library, 28m of H2OWAT heating tape.
- Freeze protection to the sprinkler pipework within the basement, 200m of VC constant wattage heating tape.
- Temperature maintenance of the domestic hot water supplies, tea point pipework on each floor, 200m of H2OWAT heating tape.
No comments:
Post a Comment