Showing posts with label Leeds. Show all posts
Showing posts with label Leeds. Show all posts

Thursday, 9 October 2014

Adel Beck Secure Children's Home, Leeds

ESH were back at Adel Beck to extend the existing 1200m of trace heating installed earlier this year. An additional run of type H2OWAT55 was supplied and installed onto the DHWS pipework, maintaining a temperature of +55°C.

Monday, 16 June 2014

Adel Beck Secure Children's Home

For this large children's home project, ESH were contracted to design, supply and install a trace heating system to temperature maintain 1200 metres of HWS pipework. The system included 12 power junction boxes with BMS fault relays fitted. This large new children's home in Leeds creates 24 bedrooms, a teaching block, a canteen, leisure facilities and administrative space.