Wednesday, 2 July 2014

Oxford Centre for Islamic Studies

Designed, supplied and install a trace heating system to perform the duty of temperature maintaining the hot water flow pipework at +55°C. To achieve this we installed our H2OWAT self regulating heating cable.

Tuesday, 1 July 2014

Sidney Stringer Academy, Coventry



Here at this ultra modern coeducational academy, ESH designed, supplied materials and labour to provide a frost protection system to the steel sprinkler system pipework within a undercroft area. 

Friday, 27 June 2014

Tate Modern Gallery, London



Part of the Tate Modern phase two extension, ESH were contracted to supply and install an Aquilar leak detection system to the RWP pipework on level 5 of this iconic new building.



Wednesday, 25 June 2014

Crownhouse Engineering, Oldbury

ESH designed, supplied and installed two separate trace heating systems to perform the following duties:
  • Provide frost protection to the BCWS pipework
  • Temperature maintain the DHWS flow and return pipework at +55°C.

Tuesday, 24 June 2014

University Technical College Cambridge

This £10 million UTC will be a new centre of excellence for Biomedical and Environmental Science and Technology for 14 to 19 year olds in the Cambridge area. ESH were contracted to design, supply and install two trace heating systems to perform the following duties:

  • To maintain domestic hot water pipework at temperatures of up to 55°C
  • To provide frost protection to the external water pipework

Monday, 23 June 2014

Kings Cross Station, London

ESH are very proud to have been involved in the £400m restoration and redevelopment of Kings Cross Station. We were contracted to design, supply and install a number of different trace heating systems throughout this iconic building:
  • Temperature maintenance of the HSWF pipework on the lower ground floor & basement cycle shower area,1050m of H2OWAT heating tape.
  • Frost protection to the external roof BCWS pipework, 660m of FBT self regulating heating tape.
  • Temperature maintenance of the BHWS pipework in Camden Library, 28m of H2OWAT heating tape.
  • Freeze protection to the sprinkler pipework within the basement, 200m of VC constant wattage heating tape.
  • Temperature maintenance of the domestic hot water supplies, tea point pipework on each floor, 200m of H2OWAT heating tape.

Monday, 16 June 2014

Adel Beck Secure Children's Home

For this large children's home project, ESH were contracted to design, supply and install a trace heating system to temperature maintain 1200 metres of HWS pipework. The system included 12 power junction boxes with BMS fault relays fitted. This large new children's home in Leeds creates 24 bedrooms, a teaching block, a canteen, leisure facilities and administrative space.