Showing posts with label Oldbury. Show all posts
Showing posts with label Oldbury. Show all posts
Friday, 14 November 2014
Rhodia CLB Plant, Oldbury
Supplied and installed trace heating to provide temperature maintenance to a short run of caustic soda pipework. The requirement was to maintain +20°C in a minimum ambient temperature of -20°C.
Tuesday, 19 August 2014
Rhodia UK, Oldbury
Within a potentially explosive atmosphere, ESH designed, supplied and installed an ATEX Approved 240v trace heating system to temperature maintain +90°C on flexible pipework.
Wednesday, 25 June 2014
Crownhouse Engineering, Oldbury
ESH designed, supplied and installed two separate trace heating systems to perform the following duties:
- Provide frost protection to the BCWS pipework
- Temperature maintain the DHWS flow and return pipework at +55°C.
Friday, 13 June 2014
Solvay Ltd, Oldbury
For this international chemical group, ESH supplied and installed 240 volt trace heating cable for the temperature maintenance of stainless steel pipework containing formaldehyde, part of the system originally installed by ESH. Type VCBOJ constant wattage heating cable was used to meet the temperature requirements.
Subscribe to:
Posts (Atom)