Showing posts with label Coventry. Show all posts
Showing posts with label Coventry. Show all posts
Monday, 8 September 2014
Amtico Ltd, Head Office Coventry
ESH designed, supplied and installed a process temperature maintenance trace heating system to stainless steel pipework containing Plasticiser. The pipework required maintaining at a temperature of +25°C in a minimum ambient of -20°C.
Tuesday, 1 July 2014
Sidney Stringer Academy, Coventry
Monday, 9 June 2014
Amtico International Head Office, Coventry
Here ESH supplied and installed at trace heating system to stainless steel pipework containing Placticiser to maintain the temperature at +25°C. In total there was 20m of external and 190m of internal flow and return pipework which required heat tracing.
Subscribe to:
Posts (Atom)
