ESH were contracted to supply and install a frost protection trace heating system to the external chilled water pipework on the roof, mezzanine area and service yard. The system was designed using type VCBOJ constant wattage heating tape.
Monday, 8 December 2014
Friday, 5 December 2014
Innovation House, Oxford
Within this brand new student accommodation building, ESH supplied and installed frost protection trace heating to two runs of external water pipework. Tapes were pre-terminated into JBT thermostats for quick installation on site.
LA Fitness Gym, Birmingham
Within this popular gym, ESH supplied and installed a simple frost protection trace heating system to external heating pipework associated with an air handling unit.
Thursday, 4 December 2014
Veolia Environmental, Tysley
Supplied and installed trace heating to provide temperature maintenance of +110°C to a fly ash hopper. The steel hopper, 2m tall and 2.3m square, was installed with mineral insulated heating cable in order to achieve the required temperatures.
Wednesday, 3 December 2014
Compound Feed Engineering, Haydock Plant
Type VCBOJ20/2 constant wattage heating tape was supplied and installed in order to maintain a stainless steel pellet mill door at +80°C. The trace heating circuit was controlled using a DTC digital thermostat.
Tuesday, 2 December 2014
Salford Royal Hospital
Supplied and installed type VCBOJ8/2 constant wattage trace heating tape to provide frost protection to external chilled water pipework. The heating tape was straight traced underneath the pipework and temperature controlled using our type STCI thermostats.
Monday, 1 December 2014
Toyota Motor Manufacturing, Derby
ESH supplied, installed and tested a trace heating system to perform the duty of temperature maintaining internal metal pipework at +30°C. This was achieved utilising type FBTBOJ20/2 self regulating heating tape.