Monday, 8 September 2014

Amtico Ltd, Head Office Coventry

ESH designed, supplied and installed a process temperature maintenance trace heating system to stainless steel pipework containing Plasticiser. The pipework required maintaining at a temperature of +25°C in a minimum ambient of -20°C.

Thursday, 4 September 2014

Veolia Environmental Ltd, Birmingham

Supplied and installed trace heating materials to repair an existing frost protection system.

Tuesday, 2 September 2014

M&S Retail Unit, Prescot

For this band new M&S store, ESH designed, supplied and installed a trace heating system to maintain a temperature of +55°C on internal DHWS copper pipework. Type H2OWAT55 self regulating heating tape was installed across 3 floors, to areas including the plantroom, staff toilets, public toilets and kitchen area.

Wednesday, 27 August 2014

Sudbury Health Centre

Here at this brand new, state of the art health centre in Suffolk, ESH supplied and installed a frost protection trace heating system to the external LTHW pipework located on the centres roof. The system was designed using type FBTBOJ self regulating heating tape.

Thursday, 21 August 2014

Eastern Promenade, Barry Island

Part of the Welsh Governments renovation of the eastern promenade, ESH were contracted to supply and install a frost protection trace heating system to the internal copper pipework within the new promenade buildings.

Tuesday, 19 August 2014

Rhodia UK, Oldbury

Within a potentially explosive atmosphere, ESH designed, supplied and installed an ATEX Approved 240v trace heating system to temperature maintain +90°C on flexible pipework.

Monday, 18 August 2014

Wildern School, Southampton

Supplied and installed a trace heating system to temperature maintain the DHWS flow pipework at +60°C. The system utilised our H2OWATT65 self regulating heating cable and offered the option to disinfect periodically against Legionella.