Wednesday, 27 August 2014

Sudbury Health Centre

Here at this brand new, state of the art health centre in Suffolk, ESH supplied and installed a frost protection trace heating system to the external LTHW pipework located on the centres roof. The system was designed using type FBTBOJ self regulating heating tape.

Thursday, 21 August 2014

Eastern Promenade, Barry Island

Part of the Welsh Governments renovation of the eastern promenade, ESH were contracted to supply and install a frost protection trace heating system to the internal copper pipework within the new promenade buildings.

Tuesday, 19 August 2014

Rhodia UK, Oldbury

Within a potentially explosive atmosphere, ESH designed, supplied and installed an ATEX Approved 240v trace heating system to temperature maintain +90°C on flexible pipework.

Monday, 18 August 2014

Wildern School, Southampton

Supplied and installed a trace heating system to temperature maintain the DHWS flow pipework at +60°C. The system utilised our H2OWATT65 self regulating heating cable and offered the option to disinfect periodically against Legionella.

Friday, 15 August 2014

St Ambrose Barlow RC High School, Manchester

Part of the Building Schools for the Future programme (BSF), this 1000 pupil high school and college required some trace heating work completed before it re-opens its doors in September. ESH were contracted to supply and install two trace heating systems to perform the following duties:

  • Provide frost protection to the schools BCWS pipework
  • Temperature maintenance of the DHWS flow and return pipework at +55°C


Wednesday, 13 August 2014

Kingsdown Crematorium, Swindon

ESH designed, supplied and installed a trace heating system to temperature maintain a hopper at +100°C. Mineral insulated heating tape was fixed to the body of the hopper in order to achieve the desired temperature. 

Monday, 11 August 2014

Radcliffe Observatory Quarter, Oxford


Oxford University's £70m Mathematical Institute is just one part of this £200m redevelopment of the 10-acre site.

ESH were contracted to design, supply and install a frost protection trace heating system to the external CWM pipework. Type FBT self limiting heating cable was used throughout this project.