Friday, 15 August 2014

St Ambrose Barlow RC High School, Manchester

Part of the Building Schools for the Future programme (BSF), this 1000 pupil high school and college required some trace heating work completed before it re-opens its doors in September. ESH were contracted to supply and install two trace heating systems to perform the following duties:

  • Provide frost protection to the schools BCWS pipework
  • Temperature maintenance of the DHWS flow and return pipework at +55°C


No comments:

Post a Comment