Magnesium Elektron, Manchester
Our second visit to Magnesium Elektron saw ESH supply and install two runs of 40w/m trace heating circuits above hoppers, in order to temperature maintain them at +55°C.
Thursday, 30 October 2014
Magnesium Elektron, Manchester
Within this manufacturing plant, ESH designed, supplied and installed a trace heating system for three hopper cones. The system was designed to temperature maintain the hopper cones at +55°C in a minimum ambient temperature of -20°C. Type VC constant wattage heating cable was used and controlled by three DTC digital thermostats.
Friday, 15 August 2014
St Ambrose Barlow RC High School, Manchester
Part of the Building Schools for the Future programme (BSF), this 1000 pupil high school and college required some trace heating work completed before it re-opens its doors in September. ESH were contracted to supply and install two trace heating systems to perform the following duties:
- Provide frost protection to the schools BCWS pipework
- Temperature maintenance of the DHWS flow and return pipework at +55°C