Friday, 30 May 2014
Salford WWTW
For this project ESH designed, supplied and installed an external frost protection trace heating system utilising type FBTBOJ self regulating heating tape.
Wednesday, 28 May 2014
St Mary's Catholic College, Blackpool
With over 1800 pupils, St Mary's is the largest Roman Catholic secondary school in Lancashire. Here ESH designed, supplied and installed a frost protection trace heating system for the schools internal sprinkler pipework. The pipework was double traced with a total of 460m of type WTB constant wattage heating cable and monitored using ESH TracePro monitoring units.Friday, 23 May 2014
Charlton Court House, Somerset
ESH supplied and installed a trace heating system for the domestic hot water services plastic pipework. The hot water services required maintaining at +55°C, this was achieved by installing our type H2OWAT55 heating tape.
Monday, 19 May 2014
Halstead Bio-Waste
ESH supplied and installed a frost protection trace heating system to condensate pipework within a ATEX area assumed to be Zone 1, Gas Group IIb, Temperature Class T3. 114m of type FBTX10/2 ATEX Certified self regulating heating tape was installed.
Thursday, 15 May 2014
The Brockmoor Foundry Ltd - Brierley Hill
Supplied and installed trace heating to provide temperature maintenance of a duct associated with a Schenk Sand Cooler. The duct was of steel construction measuring approximately 3.5m x 600mm diameter and needed to be maintained at a temperature of +60°C to +70°C.
Wednesday, 9 April 2014
Woodlands Primary School, Grimsby
The project here was to supply and install 240v trace heating for the frost protection of the LTHW flow and return pipework between the building wall and an air handling unit.
Tuesday, 8 April 2014
The Leadenhall Building - London
The Leadenhall is a unique 46 floor, 610,000 sq ft office tower prominently located in the centre of the City of London. Over the past two years, ESH have designed, supplied and installed trace heating applications across a number of floors to perform the following duties:
In total over 1740m of trace heating tape was supplied and installed within this fabulous new London landmark.
- To maintain the temperature of the domestic hot water pipework at +55°C. The system was design utilising our H2OWAT self regulating heating cable
- To provide a frost protection system to the CHW flow & return pipework feeding six cooling towers
In total over 1740m of trace heating tape was supplied and installed within this fabulous new London landmark.