Showing posts with label Grimsby. Show all posts
Showing posts with label Grimsby. Show all posts
Wednesday, 9 April 2014
Woodlands Primary School, Grimsby
The project here was to supply and install 240v trace heating for the frost protection of the LTHW flow and return pipework between the building wall and an air handling unit.
Monday, 3 March 2014
Flocktons T.V.P Ltd, Grimsby
ESH were contracted to design, supply and install a frost protection trace heating system for the lower half of a storage tank, 3m dia x 7.3m high. This project required over 210m of type FBT self regulating heating tape to complete.
Subscribe to:
Posts (Atom)