- To maintain the temperature of the domestic hot water pipework at +55°C. The system was design utilising our H2OWAT self regulating heating cable
- To provide a frost protection system to the CHW flow & return pipework feeding six cooling towers
In total over 1740m of trace heating tape was supplied and installed within this fabulous new London landmark.

No comments:
Post a Comment