Waste Disposal Plant, Swindon

ESH supplied and installed over 250 metres of type VC constant wattage heating tape in order to temperature maintain a large hooper, filter, feeds and valve at +70°C.

Thursday, 20 March 2014

Carlisle WWTW

Supplied and installed trace heating to perform the duty of providing frost protection to the external pipework in a minimum ambient temperature of -15°C.

Friday, 14 March 2014

New Pavilion - Grosvenor Park

The new pavilion was part of a £3.5m plan to restore Grosvenor Park in Chester. ESH designed, supplied and installed a 240 volt trace heating system to perform the following duties:

  • To frost protect the external chilled water pipework in a minimum ambient temperature of -20°C  
  • Provide a hot water temperature maintenance system to the HWS internal pipework

Friday, 7 March 2014

Harris Manchester College - Oxford


Here at this constituent college of the University of Oxford, ESH designed, supplied and installed a snow and ice prevention trace heating system to the lead lined flat roof areas. In total project required over 260m of type FBTBOJ self limiting heating tape.



Monday, 3 March 2014

Flocktons T.V.P Ltd, Grimsby

ESH were contracted to design, supply and install a frost protection trace heating system for the lower half of a storage tank, 3m dia x 7.3m high. This project required over 210m of type FBT self regulating heating tape to complete.

Friday, 28 February 2014

Weston Park Hospital, Sheffield

ESH were contract to design, supply and install a 240 volt, 10w/m self regulating trace heating system to provide frost protection to the external CHW pipework. Type ESRS heating cable was installed throughout.

Thursday, 20 February 2014

The Cambrian Centre - Newport


This £50 million mixed-use development, in Newport South Wales, will supply the Admiral Insurance Group with 7,500m² of space. 

Here ESH designed, supplied and installed a frost protection trace heating system to over 540 metres of external pipework on the roof area. The pipework comprised of 50mm NB LTHW and 150mm NB CHW pipe.