This
£50 million mixed-use development, in Newport South Wales, will supply the
Admiral Insurance Group with 7,500m² of space.
Here ESH designed, supplied and installed a frost protection trace heating system to over 540 metres of external pipework on the roof area. The pipework comprised of 50mm NB LTHW and 150mm NB CHW pipe.
Here ESH designed, supplied and installed a frost protection trace heating system to over 540 metres of external pipework on the roof area. The pipework comprised of 50mm NB LTHW and 150mm NB CHW pipe.

No comments:
Post a Comment