Friday, 14 March 2014

New Pavilion - Grosvenor Park

The new pavilion was part of a £3.5m plan to restore Grosvenor Park in Chester. ESH designed, supplied and installed a 240 volt trace heating system to perform the following duties:

  • To frost protect the external chilled water pipework in a minimum ambient temperature of -20°C  
  • Provide a hot water temperature maintenance system to the HWS internal pipework

No comments:

Post a Comment