Friday, 23 May 2014

Charlton Court House, Somerset

ESH supplied and installed a trace heating system for the domestic hot water services plastic pipework. The hot water services required maintaining at +55°C, this was achieved by installing our type H2OWAT55 heating tape.

Monday, 19 May 2014

Halstead Bio-Waste

ESH supplied and installed a frost protection trace heating system to condensate pipework within a ATEX area assumed to be Zone 1, Gas Group IIb, Temperature Class T3. 114m of type FBTX10/2 ATEX Certified self regulating heating tape was installed.

Thursday, 15 May 2014

The Brockmoor Foundry Ltd - Brierley Hill

Supplied and installed trace heating to provide temperature maintenance of a duct associated with a Schenk Sand Cooler. The duct was of steel construction measuring approximately 3.5m x 600mm diameter and needed to be maintained at a temperature of +60°C to +70°C.

Wednesday, 9 April 2014

Woodlands Primary School, Grimsby

The project here was to supply and install 240v trace heating for the frost protection of the LTHW flow and return pipework between the building wall and an air handling unit.

Tuesday, 8 April 2014

The Leadenhall Building - London

The Leadenhall is a unique 46 floor, 610,000 sq ft office tower prominently located in the centre of the City of London. Over the past two years, ESH have designed, supplied and installed trace heating applications across a number of floors to perform the following duties: 

  • To maintain the temperature of the domestic hot water pipework at +55°C. The system was design utilising our H2OWAT self regulating heating cable
  • To provide a frost protection system to the CHW flow & return pipework feeding six cooling towers

In total over 1740m of trace heating tape was supplied and installed within this fabulous new London landmark.


Monday, 7 April 2014

William Street Quarter - Barking

This housing project on a 2.5 hectare site of the former Linton Estate, will provide around half of the affordable rent properties for the London Borough of Barking and Dagenham's Reside scheme. 

ESH were contracted to design, supply and install over 680 metres of type FBTBOJ self limiting heating tape to provide frost protection to the external BCWS and LTHW (flow & return) pipework, on top of 13 modular roofs.

Barnsley District & General Hospital

For this Raychem specified project, ESH supplied and installed a trace heating system for frost protection to the CHW pipework and CWS pipework. 170m of Raychem self regulating trace heating cable FS-A-2X was installed to complete the system.