Showing posts with label Barnsley. Show all posts
Showing posts with label Barnsley. Show all posts

Monday, 7 April 2014

Barnsley District & General Hospital

For this Raychem specified project, ESH supplied and installed a trace heating system for frost protection to the CHW pipework and CWS pipework. 170m of Raychem self regulating trace heating cable FS-A-2X was installed to complete the system.

Friday, 17 January 2014

Barnsley District & General Hospital

For this frost protection Raychem specified project, ESH installed Raychem type FS-B-2X self limiting heating tape onto the CHW pipework.