Thursday, 3 April 2014

City Hospital, Nottingham


Within City Hospitals new £6.6m cystic fibrosis unit, ESH were contracted to design, supply and install a trace heating system to provide frost protection to the external MCWS and HWS pipework. The system was designed using type VCBOJ constant wattage heating cable.

Tuesday, 1 April 2014

Doncaster Royal Infirmary

ESH designed, supplied and installed a type VC constant wattage trace heating system in order to frost protect the hospitals low temperature hot water (LTHW) pipework.

Friday, 21 March 2014

Waste Disposal Plant, Swindon

ESH supplied and installed over 250 metres of type VC constant wattage heating tape in order to temperature maintain a large hooper, filter, feeds and valve at +70°C.

Thursday, 20 March 2014

Carlisle WWTW

Supplied and installed trace heating to perform the duty of providing frost protection to the external pipework in a minimum ambient temperature of -15°C.

Friday, 14 March 2014

New Pavilion - Grosvenor Park

The new pavilion was part of a £3.5m plan to restore Grosvenor Park in Chester. ESH designed, supplied and installed a 240 volt trace heating system to perform the following duties:

  • To frost protect the external chilled water pipework in a minimum ambient temperature of -20°C  
  • Provide a hot water temperature maintenance system to the HWS internal pipework

Friday, 7 March 2014

Harris Manchester College - Oxford


Here at this constituent college of the University of Oxford, ESH designed, supplied and installed a snow and ice prevention trace heating system to the lead lined flat roof areas. In total project required over 260m of type FBTBOJ self limiting heating tape.



Monday, 3 March 2014

Flocktons T.V.P Ltd, Grimsby

ESH were contracted to design, supply and install a frost protection trace heating system for the lower half of a storage tank, 3m dia x 7.3m high. This project required over 210m of type FBT self regulating heating tape to complete.