Here at this brand new, state of the art health centre in Suffolk, ESH supplied and installed a frost protection trace heating system to the external LTHW pipework located on the centres roof. The system was designed using type FBTBOJ self regulating heating tape.Wednesday, 27 August 2014
Sudbury Health Centre
Here at this brand new, state of the art health centre in Suffolk, ESH supplied and installed a frost protection trace heating system to the external LTHW pipework located on the centres roof. The system was designed using type FBTBOJ self regulating heating tape.Thursday, 21 August 2014
Eastern Promenade, Barry Island
Part of the Welsh Governments renovation of the eastern promenade, ESH were contracted to supply and install a frost protection trace heating system to the internal copper pipework within the new promenade buildings.
Tuesday, 19 August 2014
Rhodia UK, Oldbury
Within a potentially explosive atmosphere, ESH designed, supplied and installed an ATEX Approved 240v trace heating system to temperature maintain +90°C on flexible pipework.
Monday, 18 August 2014
Wildern School, Southampton
Supplied and installed a trace heating system to temperature maintain the DHWS flow pipework at +60°C. The system utilised our H2OWATT65 self regulating heating cable and offered the option to disinfect periodically against Legionella.
Friday, 15 August 2014
St Ambrose Barlow RC High School, Manchester
Part of the Building Schools for the Future programme (BSF), this 1000 pupil high school and college required some trace heating work completed before it re-opens its doors in September. ESH were contracted to supply and install two trace heating systems to perform the following duties:
- Provide frost protection to the schools BCWS pipework
- Temperature maintenance of the DHWS flow and return pipework at +55°C
Wednesday, 13 August 2014
Kingsdown Crematorium, Swindon
ESH designed, supplied and installed a trace heating system to temperature maintain a hopper at +100°C. Mineral insulated heating tape was fixed to the body of the hopper in order to achieve the desired temperature.
Monday, 11 August 2014
Radcliffe Observatory Quarter, Oxford

Oxford University's £70m Mathematical Institute is just one part of this £200m redevelopment of the 10-acre site.
ESH were contracted to design, supply and install a frost protection trace heating system to the external CWM pipework. Type FBT self limiting heating cable was used throughout this project.
Thursday, 7 August 2014
Salford WWTW
Wednesday, 6 August 2014
Operating Theatres, Northern General Hospital
Our second project here at this Sheffield based hospital saw ESH design, supply and install two separate trace heating systems:
- The first system was designed using our type FTB self limiting heating tape to provide frost protection to external chilled pipework
- The second frost protection system on the HTG pipework was Raychem specified, 70m of Raychem FS-A-2X heating tape was supplied and installed
Monday, 4 August 2014
Carlisle WWTW
Supplied and installed trace heating, insulation and metal cladding to external pipework to prevent ice formation within the pipes.
Friday, 1 August 2014
Halstead Bio-Waste
Designed, supplied and installed a frost protection trace heating system to two runs of metal pipework containing cold water. One run of pipework was leading to the turbo dissolvers, the other to the heat exchangers. Type FBTBOJ self regulating heating cable was installed throughout.