Tuesday, 28 January 2014
Bourne Vale Pumping Station
ESH were contracted to supply materials and labour to install and commission a trace heating system for metal pipework containing caustic soda to be maintained at +20°C. The system was designed using type FBT self regulating heating cable.
Friday, 24 January 2014
Veolia Environmental, Tysley
ESH were contacted to design, supply and install a high temperature trace heating system to provide temperature maintenance of +110°C to a steel fly ash hopper (2m tall x 2.3m square).
Tuesday, 21 January 2014
Northern General Hospital, Sheffield
A Raychem specified project, ESH installed type FS-C-2X self regulating heating cable to frost protect external LTHW pipework.
Friday, 17 January 2014
Barnsley District & General Hospital
For this frost protection Raychem specified project, ESH installed Raychem type FS-B-2X self limiting heating tape onto the CHW pipework.
Market Weighton WWTW
A frost protection project on external metal pipework required ESH to design, supply and install a trace heating system using our type FBT self regulating heating cable.
Tuesday, 14 January 2014
Fox's Biscuits - Uttoxeter
Within Fox's food manufacturing unit, ESH were contracted to design, supply and install two separate trace heating systems:
- System one was the temperature maintenance of a large vessel at +40°C
- System two required the heat raising of a vessel from a starting temperature of +5°C up to +40°C
Wednesday, 8 January 2014
Kings College Hospital - London
For this major London teaching hospital, ESH supplied over 580 metres of constant wattage heating tape along with thermostats,
junction box's and all other trace heating ancillaries. Labour was also
supplied to complete onsite terminations.
Rumenco, Burton on Trent
For this process temperature maintenance application, ESH designed, supplied and installed a trace heating system to a stainless steel tank containing molasses. The 1.22m diameter x 1.37m tall steel tank, needed to maintain a temperature between +60 to +70°C.
Tuesday, 7 January 2014
Bristol Water WTW
Within this water
treatment works, ESH designed, supplied and installed a frost protection trace heating
system onto plastic pipework in two external areas:

- Water pipework in a Brine Bund area - 32mm NB pipework to be maintained at +5°C
- Pipework in the Sodium
Hypochlorite Bund area - 100mm NB pipework to be maintained at 0°C