Within this water
treatment works, ESH designed, supplied and installed a frost protection trace heating
system onto plastic pipework in two external areas:

- Water pipework in a Brine Bund area - 32mm NB pipework to be maintained at +5°C
- Pipework in the Sodium
Hypochlorite Bund area - 100mm NB pipework to be maintained at 0°C
No comments:
Post a Comment