Wednesday, 6 August 2014

Operating Theatres, Northern General Hospital

Our second project here at this Sheffield based hospital saw ESH design, supply and install two separate trace heating systems:
  • The first system was designed using our type FTB self limiting heating tape to provide frost protection to external chilled pipework
  • The second frost protection system on the HTG pipework was Raychem specified, 70m of Raychem FS-A-2X heating tape was supplied and installed

Monday, 4 August 2014

Carlisle WWTW

Supplied and installed trace heating, insulation and metal cladding to external pipework to prevent ice formation within the pipes.

Friday, 1 August 2014

Halstead Bio-Waste

Designed, supplied and installed a frost protection trace heating system to two runs of metal pipework containing cold water. One run of pipework was leading to the turbo dissolvers, the other to the heat exchangers. Type FBTBOJ self regulating heating cable was installed throughout.

Thursday, 31 July 2014

Thorndown Primary School, St. Ives



Part of Thorndown's £9.5 million project to knock down the existing school and replace it with a new two storey building, ESH were contracted to design, supply and install a trace heating system to perform the duty of providing frost protection to the external heat pump pipework and kitchen AHU pipework.

Friday, 25 July 2014

Ercall Wood Academy, Telford


Ercall Wood will be the third new Academy, when it opens in September 2015, in Telford & Wrekin Council's £200m Building Schools for the Future project. Here at this local school, ESH were contracted to design, supply and install a frost protection trace heating system to the LTHW copper pipework on the academy's roof. The system utilised ESH's type VC constant wattage heating tape.

Monday, 14 July 2014

FSD Mech Ltd, Halesowen

Within FSD's 7000 square foot manufacturing plant, ESH were contracted to supply and install a frost protection trace heating system to skid mounted pipework.

Friday, 11 July 2014

John Lewis, Milton Keynes

For this retailing giant, ESH supplied and installed a constant wattage trace heating system to perform the duty of frost protecting pipework. The project was spilt into two areas:
  • Extend a system previously installed by others. A short run of trace heating on copper pipe required extending and connected into the existing junction box.
  • Also installation of a brand new heating circuit onto both ABS and steel pipework.