Showing posts with label Newcastle-Upon-Tyne. Show all posts
Showing posts with label Newcastle-Upon-Tyne. Show all posts
Tuesday, 25 November 2014
Jobling Purser Asphalt Plant, Newcastle-Upon-Tyne
The second part of this project saw ESH supply and install an industrial heating panel to a dispensing head. We also insulated the heating pad using armourflex insulation.
Monday, 27 October 2014
Jobling Purser Asphalt Plant, Newcastle-Upon-Tyne
As a highway maintenance specialists, Jobling Purser develop and manufacture a wide range of products used around the world. ESH designed, supplied and installed a trace heating system to maintain a 4" steel bitumen line at +80°C.
In a minimum ambient temperature of -20°C, over 300 metres of type SC constant wattage heating tape was triple traced to the underside of the pipework in order to maintain the required product temperature.
In a minimum ambient temperature of -20°C, over 300 metres of type SC constant wattage heating tape was triple traced to the underside of the pipework in order to maintain the required product temperature.
Thursday, 10 July 2014
Jobling Purser, Newcastle-Upton-Tyne
ESH supplied and installed a high temperature trace heating system to temperature maintain the Bitumen tank line pipework at +145ยบC. Type SC constant wattage heating tape was straight traced five times along the pipework length to achieve this high temperature.
Subscribe to:
Posts (Atom)