Waste Disposal Plant, Swindon
ESH supplied and installed over 250 metres of type VC constant wattage heating tape in order to temperature maintain a large hooper, filter, feeds and valve at +70°C.
Thursday, 20 March 2014
Carlisle WWTW
Supplied and installed trace heating to perform the duty of providing frost protection to the external pipework in a minimum ambient temperature of -15°C.
Friday, 14 March 2014
New Pavilion - Grosvenor Park
The new pavilion was part of a £3.5m plan to restore Grosvenor Park in Chester. ESH designed, supplied and installed a 240 volt trace heating system to perform the following duties:
- Provide a hot water temperature maintenance system to the HWS internal pipework
Friday, 7 March 2014
Harris Manchester College - Oxford
Here at this constituent
college of the University
of Oxford , ESH designed, supplied
and installed a snow and ice prevention trace heating system to the lead lined flat
roof areas. In total project required over 260m of type FBTBOJ self limiting heating
tape.
Monday, 3 March 2014
Flocktons T.V.P Ltd, Grimsby
ESH were contracted to design, supply and install a frost protection trace heating system for the lower half of a storage tank, 3m dia x 7.3m high. This project required over 210m of type FBT self regulating heating tape to complete.