Friday, 28 February 2014

Weston Park Hospital, Sheffield

ESH were contract to design, supply and install a 240 volt, 10w/m self regulating trace heating system to provide frost protection to the external CHW pipework. Type ESRS heating cable was installed throughout.

Thursday, 20 February 2014

The Cambrian Centre - Newport


This £50 million mixed-use development, in Newport South Wales, will supply the Admiral Insurance Group with 7,500m² of space. 

Here ESH designed, supplied and installed a frost protection trace heating system to over 540 metres of external pipework on the roof area. The pipework comprised of 50mm NB LTHW and 150mm NB CHW pipe.

Thursday, 13 February 2014

Marriot Court, Bishop Storford


For this new office development ESH were asked to design and supply underfloor ramp heating to two separate sloped areas on the car park. In total 390m of type VC constant wattage was supplied along with 4 ETO thermostats and ancillaries.

Tuesday, 4 February 2014

Drax Power Station, Sleby



Part for the £200 million ECOstore project at Drax Power Station, ESH were contracted to design, supply and install 4 custom made flexible insulated heating jackets, included hazardous area trace heating cable and safe area components.

Haxby & Strensall WWTW

Within this waste water treatment works, ESH designed, supplied and installed a temperature maintenance trace heating system. The system was designed using type FBT self regulating heating tape in order to maintain the required temperature of +10°C on the plastic pipework.

Monday, 3 February 2014

National Grid, Effingham Street

For this project, ESH supplied and installed both the trace heating and thermal insulation to provide a frost protection system to external pipework. Type FBT self regulating heating cable was the cable of choice for this site.