Wednesday, 13 August 2014

Kingsdown Crematorium, Swindon

ESH designed, supplied and installed a trace heating system to temperature maintain a hopper at +100°C. Mineral insulated heating tape was fixed to the body of the hopper in order to achieve the desired temperature. 

Monday, 11 August 2014

Radcliffe Observatory Quarter, Oxford


Oxford University's £70m Mathematical Institute is just one part of this £200m redevelopment of the 10-acre site.

ESH were contracted to design, supply and install a frost protection trace heating system to the external CWM pipework. Type FBT self limiting heating cable was used throughout this project.




Thursday, 7 August 2014

Salford WWTW



ESH supplied and installed a trace heating system using type FBT self regulating heating tape to provide frost protection to various external pipework.

Wednesday, 6 August 2014

Operating Theatres, Northern General Hospital

Our second project here at this Sheffield based hospital saw ESH design, supply and install two separate trace heating systems:
  • The first system was designed using our type FTB self limiting heating tape to provide frost protection to external chilled pipework
  • The second frost protection system on the HTG pipework was Raychem specified, 70m of Raychem FS-A-2X heating tape was supplied and installed

Monday, 4 August 2014

Carlisle WWTW

Supplied and installed trace heating, insulation and metal cladding to external pipework to prevent ice formation within the pipes.

Friday, 1 August 2014

Halstead Bio-Waste

Designed, supplied and installed a frost protection trace heating system to two runs of metal pipework containing cold water. One run of pipework was leading to the turbo dissolvers, the other to the heat exchangers. Type FBTBOJ self regulating heating cable was installed throughout.

Thursday, 31 July 2014

Thorndown Primary School, St. Ives



Part of Thorndown's £9.5 million project to knock down the existing school and replace it with a new two storey building, ESH were contracted to design, supply and install a trace heating system to perform the duty of providing frost protection to the external heat pump pipework and kitchen AHU pipework.