Friday, 4 July 2014

Wilton Centre, Redcar

Our second large project here at the Wilton Centre saw ESH supply materials and labour to extend the existing trace heating circuits, relocate existing thermostats and install new circuits. The high temperature trace heating system needed to maintain the pipework temperature at +150°C all within a Zone 1 Gas Group llb, T3 Classification hazardous area.

No comments:

Post a Comment